← Procore + Slack integrations

Send Message to a Public Channel with Slack API on Prime Contract Change Order Event (Instant) from Procore API

Pipedream makes it easy to connect APIs for Slack, Procore and 1,600+ other apps remarkably fast.

Trigger workflow on
Prime Contract Change Order Event (Instant) from the Procore API
Next, do this
Send Message to a Public Channel with the Slack API
No credit card required
Intro to Pipedream
Watch us build a workflow
Watch us build a workflow
7 min
Watch now ➜

Trusted by 750,000+ developers from startups to Fortune 500 companies

Adyen logo
Appcues logo
Bandwidth logo
Checkr logo
ChartMogul logo
Dataminr logo
Gopuff logo
Gorgias logo
LinkedIn logo
Logitech logo
Replicated logo
Rudderstack logo
SAS logo
Scale AI logo
Webflow logo
Warner Bros. logo
Adyen logo
Appcues logo
Bandwidth logo
Checkr logo
ChartMogul logo
Dataminr logo
Gopuff logo
Gorgias logo
LinkedIn logo
Logitech logo
Replicated logo
Rudderstack logo
SAS logo
Scale AI logo
Webflow logo
Warner Bros. logo

Developers Pipedream

Getting Started

This integration creates a workflow with a Procore trigger and Slack action. When you configure and deploy the workflow, it will run on Pipedream's servers 24x7 for free.

  1. Select this integration
  2. Configure the Prime Contract Change Order Event (Instant) trigger
    1. Connect your Procore account
    2. Select a Company
    3. Optional- Select a Project
  3. Configure the Send Message to a Public Channel action
    1. Connect your Slack account
    2. Select a Channel ID
    3. Configure Text
    4. Optional- Configure Send text as Slack mrkdwn
    5. Optional- Configure Bot Username
    6. Optional- Select a Icon (emoji)
    7. Optional- Configure Icon (image URL)
    8. Optional- Configure Send as User
    9. Optional- Configure Schedule message
    10. Optional- Configure Include link to workflow
    11. Optional- Configure Metadata Event Type
    12. Optional- Configure Metadata Event Payload
  4. Deploy the workflow
  5. Send a test event to validate your setup
  6. Turn on the trigger

Details

This integration uses pre-built, source-available components from Pipedream's GitHub repo. These components are developed by Pipedream and the community, and verified and maintained by Pipedream.

To contribute an update to an existing component or create a new component, create a PR on GitHub. If you're new to Pipedream component development, you can start with quickstarts for trigger span and action development, and then review the component API reference.

Trigger

Description:Emits an event each time a Prime Contract Change Order is created, updated, or deleted in a project.
Version:0.0.2
Key:procore-prime-contract-change-order

Procore Overview

Procore's API enables developers to build powerful applications for industries with complex workflows, such as construction. With the Procore API, you can extend and customize Procore's existing features, integrate with external platforms and applications, and create innovative solutions for your organization.

Here are some examples of what you can build with the Procore API:

  • Automatically sync project documents with external file storage systems
  • Streamline transition from bids to projects
  • Create custom reports on key project metrics
  • Generate custom invoices with custom language and branding
  • Automatically monitor and respond to changes in project scheduling
  • Develop dashboards to set up tracking for subcontractors and suppliers
  • Automate communication between stakeholders
  • Integrate Procore user data with third-party applications

Trigger Code

const common = require("../common.js");

module.exports = {
  ...common,
  name: "Prime Contract Change Order Event (Instant)",
  key: "procore-prime-contract-change-order",
  description:
    "Emits an event each time a Prime Contract Change Order is created, updated, or deleted in a project.",
  version: "0.0.2",
  type: "source",
  methods: {
    ...common.methods,
    getResourceName() {
      return "Change Order Packages";
    },
    async getDataToEmit(body) {
      const { resource_id: resourceId } = body;
      const resource = await this.procore.getChangeOrderPackage(
        this.company,
        this.project,
        resourceId,
      );
      return {
        ...body,
        resource,
      };
    },
    getMeta(body) {
      const {
        id,
        event_type: eventType,
        resource_id: resourceId,
        timestamp,
      } = body;
      const ts = new Date(timestamp).getTime();
      return {
        id,
        summary: `${eventType} Change Order ID:${resourceId}`,
        ts,
      };
    },
  },
};

Trigger Configuration

This component may be configured based on the props defined in the component code. Pipedream automatically prompts for input values in the UI and CLI.
LabelPropTypeDescription
ProcoreprocoreappThis component uses the Procore app.
N/Adb$.service.dbThis component uses $.service.db to maintain state between executions.
N/Ahttp$.interface.httpThis component uses $.interface.http to generate a unique URL when the component is first instantiated. Each request to the URL will trigger the run() method of the component.
CompanycompanyintegerSelect a value from the drop down menu.
ProjectprojectintegerSelect a value from the drop down menu.

Trigger Authentication

Procore uses OAuth authentication. When you connect your Procore account, Pipedream will open a popup window where you can sign into Procore and grant Pipedream permission to connect to your account. Pipedream securely stores and automatically refreshes the OAuth tokens so you can easily authenticate any Procore API.

Pipedream requests the following authorization scopes when you connect your account:

About Procore

The all-in-one construction management software built to help you finish quality projects — safely, on time, and within budget.

Action

Description:Send a message to a public channel and customize the name and avatar of the bot that posts the message. See [postMessage](https://api.slack.com/methods/chat.postMessage) or [scheduleMessage](https://api.slack.com/methods/chat.scheduleMessage) docs here
Version:0.2.17
Key:slack-send-message-public-channel

Slack Overview

The Pipedream Slack app enables you to build event-driven workflows that interact with the Slack API. When you authorize the Pipedream app's access to your workspace, you can use Pipedream workflows to perform common Slack actions, or write your own code against the Slack API.

The Pipedream Slack app is not a typical app. You don't interact with it directly as a bot, and it doesn't add custom functionality to your workspace out of the box. It just makes it easier to automate anything you'd typically use the Slack API for, using Pipedream workflows.

Here are some examples of automations you can build with Pipedream on Slack:

  • Automate posting updates to your team channel
  • Create a bot to answer common questions
  • Integrate with your existing tools and services
  • Build a custom dashboard to track your team's progress
  • Create a bot to handle scheduling and meeting requests
  • And much more!

Should I use the Slack or Slack Bot app on Pipedream?

The Slack app is the easiest and most convienent option to get started. It installs the official Pipedream bot into your Slack workspace with just a few clicks.

However, if you'd like to use your own bot registered with the Slack API, you can use the Slack Bot app instead.

The Slack Bot requires a bot token to allow your Pipedream workflows to authenticate as your bot. The extra set up steps allow you to list your custom bot on the Slack Marketplace, or install the bot on other workspaces as your bot's name instead of as Pipedream.

Action Code

import common from "../common/send-message.mjs";
import constants from "../../common/constants.mjs";

export default {
  ...common,
  key: "slack-send-message-public-channel",
  name: "Send Message to a Public Channel",
  description: "Send a message to a public channel and customize the name and avatar of the bot that posts the message. See [postMessage](https://api.slack.com/methods/chat.postMessage) or [scheduleMessage](https://api.slack.com/methods/chat.scheduleMessage) docs here",
  version: "0.2.17",
  type: "action",
  props: {
    slack: common.props.slack,
    conversation: {
      propDefinition: [
        common.props.slack,
        "channelId",
        () => ({
          types: [
            constants.CHANNEL_TYPE.PUBLIC,
          ],
        }),
      ],
    },
    text: {
      propDefinition: [
        common.props.slack,
        "text",
      ],
    },
    mrkdwn: {
      propDefinition: [
        common.props.slack,
        "mrkdwn",
      ],
    },
    username: {
      propDefinition: [
        common.props.slack,
        "username",
      ],
      description: "Optionally customize your bot's username (default is `Pipedream`).",
    },
    icon_emoji: {
      propDefinition: [
        common.props.slack,
        "icon_emoji",
      ],
      description: "Optionally use an emoji as the bot icon for this message (e.g., `:fire:`). This value overrides `icon_url` if both are provided.",
    },
    icon_url: {
      propDefinition: [
        common.props.slack,
        "icon_url",
      ],
      description: "Optionally provide an image URL to use as the bot icon for this message.",
    },
    ...common.props,
  },
};

Action Configuration

This component may be configured based on the props defined in the component code. Pipedream automatically prompts for input values in the UI.

LabelPropTypeDescription
SlackslackappThis component uses the Slack app.
Channel IDconversationstringSelect a value from the drop down menu.
Texttextstring

Text of the message to send (see Slack's formatting docs). This field is usually necessary, unless you're providing only attachments instead.

Send text as Slack mrkdwnmrkdwnboolean

TRUE by default. Pass FALSE to disable Slack markup parsing. See docs here

Bot Usernameusernamestring

Optionally customize your bot's user name (default is Pipedream). Must be used in conjunction with as_user set to false, otherwise ignored.

Icon (emoji)icon_emojistringSelect a value from the drop down menu.
Icon (image URL)icon_urlstring

Optionally provide an image URL to use as the icon for this message. Must be used in conjunction with as_user set to false, otherwise ignored.

Send as Useras_userboolean

Optionally pass TRUE to post the message as the authed user, instead of as a bot. Defaults to FALSE.

Schedule messagepost_atinteger

Messages can only be scheduled up to 120 days in advance, and cannot be scheduled for the past. The datetime format should be a unix timestamp (e.g., 1650507616, see here for help with this format).

Include link to workflowinclude_sent_via_pipedream_flagboolean

Defaults to true, includes a link to the workflow at the end of your Slack message.

Metadata Event Typemetadata_event_typestring

The name of the metadata event

Metadata Event Payloadmetadata_event_payloadstring

The payload of the metadata event. Must be a JSON string e.g. {"key": "value"}

Action Authentication

Slack uses OAuth authentication. When you connect your Slack account, Pipedream will open a popup window where you can sign into Slack and grant Pipedream permission to connect to your account. Pipedream securely stores and automatically refreshes the OAuth tokens so you can easily authenticate any Slack API.

Pipedream requests the following authorization scopes when you connect your account:

bookmarks:writecalls:readcalls:writechannels:historychannels:readchannels:writednd:readdnd:writeemoji:readfiles:readgroups:historygroups:readgroups:writeim:historyim:readim:writelinks:readlinks:writempim:historympim:readmpim:writepins:readpins:writereactions:readreactions:writereminders:readreminders:writeremote_files:readremote_files:sharestars:readstars:writeteam:readusergroups:readusergroups:writeusers:readusers:read.emailusers:writechat:write:botchat:write:usercommandsfiles:write:userusers.profile:writeusers.profile:readsearch:read

About Slack

Slack is a channel-based messaging platform. With Slack, people can work together more effectively, connect all their software tools and services, and find the information they need to do their best work — all within a secure, enterprise-grade environment.

More Ways to Connect Slack + Procore

Add Star with Slack API on Budget Snapshot Event (Instant) from Procore API
Procore + Slack
 
Try it
Archive Channel with Slack API on Budget Snapshot Event (Instant) from Procore API
Procore + Slack
 
Try it
Complete Reminder with Slack API on Budget Snapshot Event (Instant) from Procore API
Procore + Slack
 
Try it
Create Reminder with Slack API on Budget Snapshot Event (Instant) from Procore API
Procore + Slack
 
Try it
Delete Message with Slack API on Budget Snapshot Event (Instant) from Procore API
Procore + Slack
 
Try it
Budget Snapshot Event (Instant) from the Procore API

Emits an event each time a Budget Snapshot is created, updated, or deleted in a project.

 
Try it
Commitment Change Order Event (Instant) from the Procore API

Emits an event each time a Commitment Change Order is created, updated, or deleted in a project.

 
Try it
New Event (Instant) from the Procore API

Emits an event for each webhook notification.

 
Try it
Prime Contract Change Order Event (Instant) from the Procore API

Emits an event each time a Prime Contract Change Order is created, updated, or deleted in a project.

 
Try it
Prime Contract Event(Instant) from the Procore API

Emits an event each time a Prime Contract is created, updated, or deleted in a project.

 
Try it
Send Message to a Public Channel with the Slack API

Send a message to a public channel and customize the name and avatar of the bot that posts the message. See postMessage or scheduleMessage docs here

 
Try it
Send Message to a Private Channel with the Slack API

Send a message to a private channel and customize the name and avatar of the bot that posts the message. See postMessage or scheduleMessage docs here

 
Try it
Send a Direct Message with the Slack API

Send a direct message to a single user. See postMessage or scheduleMessage docs here

 
Try it
Build and Send a Block Kit Message (Beta) with the Slack API

Configure custom blocks and send to a channel, group, or user. See Slack's docs for more info.

 
Try it
Reply to a Message Thread with the Slack API

Send a message as a threaded reply. See postMessage or scheduleMessage docs here

 
Try it

Explore Other Apps

1
-
12
of
1,600+
apps by most popular

HTTP / Webhook
HTTP / Webhook
Get a unique URL where you can send HTTP or webhook requests
Node
Node
Anything you can do with Node.js, you can do in a Pipedream workflow. This includes using most of npm's 400,000+ packages.
Beta
Python
Python
Anything you can do in Python can be done in a Pipedream Workflow. This includes using any of the 350,000+ PyPi packages available in your Python powered workflows.
Schedule
Schedule
Trigger workflows on an interval or cron schedule.
Beta
Data Stores
Data Stores
Use Pipedream Data Stores to manage state throughout your workflows.
Telegram Bot
Telegram Bot
Telegram is a cloud-based instant messaging and voice over IP service
OpenAI (ChatGPT)
OpenAI (ChatGPT)
OpenAI is an AI research and deployment company with the mission to ensure that artificial general intelligence benefits all of humanity. They are the makers of popular apps like ChatGPT and DALL·E 2.
Google Sheets
Google Sheets
With Google Sheets, you can create, edit, and collaborate wherever you are
Discord
Discord
Use this app to create a Discord source that emits messages from your guild to a Pipedream workflow.
GitHub
GitHub
Where the world builds software. Millions of developers and companies build, ship, and maintain their software on GitHub—the largest and most advanced development platform in the world.
Formatting
Formatting
Pre-built actions to make formatting and manipulating data within your workflows easier.
Slack
Slack
Slack is a channel-based messaging platform. With Slack, people can work together more effectively, connect all their software tools and services, and find the information they need to do their best work — all within a secure, enterprise-grade environment.