← Procore + Google Sheets integrations

Add Multiple Rows with Google Sheets APIon Prime Contract Change Order Event (Instant) from Procore API

Pipedream makes it easy to connect APIs for Google Sheets, Procore and + other apps remarkably fast.

Trigger workflow on
Prime Contract Change Order Event (Instant) from the Procore API
Next, do this
Add Multiple Rows with the Google Sheets API
No credit card required
Trusted by 200,000+ developers from startups to Fortune 500 companies:
Trusted by 200,000+ developers from startups to Fortune 500 companies

Developers Pipedream

Getting Started

This integration creates a workflow with a Procore trigger and Google Sheets action. When you configure and deploy the workflow, it will run on Pipedream's servers 24x7 for free.

  1. Select this integration
  2. Configure the Prime Contract Change Order Event (Instant) trigger
    1. Connect your Procore account
    2. Select a Company
    3. Optional- Select a Project
  3. Configure the Add Multiple Rows action
    1. Connect your Google Sheets account
    2. Select a Drive
    3. Select a Spreadsheet
    4. Select a Sheet Name
    5. Configure Row Values
  4. Deploy the workflow
  5. Send a test event to validate your setup
  6. Turn on the trigger

Details

This integration uses pre-built, open source components from Pipedream's GitHub repo. These components are developed by Pipedream and the community, and verified and maintained by Pipedream.

To contribute an update to an existing component or create a new component, create a PR on GitHub. If you're new to Pipedream component development, you can start with quickstarts for trigger span and action development, and then review the component API reference.

Trigger

Description:Emits an event each time a Prime Contract Change Order is created, updated, or deleted in a project.
Version:0.0.1
Key:procore-prime-contract-change-order

Trigger Code

const common = require("../common.js");

module.exports = {
  ...common,
  name: "Prime Contract Change Order Event (Instant)",
  key: "procore-prime-contract-change-order",
  description:
    "Emits an event each time a Prime Contract Change Order is created, updated, or deleted in a project.",
  version: "0.0.1",
  methods: {
    ...common.methods,
    getResourceName() {
      return "Change Order Packages";
    },
    async getDataToEmit(body) {
      const { resource_id: resourceId } = body;
      const resource = await this.procore.getChangeOrderPackage(
        this.company,
        this.project,
        resourceId
      );
      return { ...body, resource };
    },
    getMeta(body) {
      const {
        id,
        event_type: eventType,
        resource_id: resourceId,
        timestamp,
      } = body;
      const ts = new Date(timestamp).getTime();
      return {
        id,
        summary: `${eventType} Change Order ID:${resourceId}`,
        ts,
      };
    },
  },
};

Trigger Configuration

This component may be configured based on the props defined in the component code. Pipedream automatically prompts for input values in the UI and CLI.
LabelPropTypeDescription
ProcoreprocoreappThis component uses the Procore app.
N/Adb$.service.dbThis component uses $.service.db to maintain state between component invocations.
N/Ahttp$.interface.httpThis component uses $.interface.http to generate a unique URL when the component is first instantiated. Each request to the URL will trigger the run() method of the component.
CompanycompanyintegerSelect a value from the drop down menu.
ProjectprojectintegerSelect a value from the drop down menu.

Trigger Authentication

Procore uses OAuth authentication. When you connect your Procore account, Pipedream will open a popup window where you can sign into Procore and grant Pipedream permission to connect to your account. Pipedream securely stores and automatically refreshes the OAuth tokens so you can easily authenticate any Procore API.

Pipedream requests the following authorization scopes when you connect your account:

About Procore

The all-in-one construction management software built to help you finish quality projects — safely, on time, and within budget.

Action

Description:Add multiple rows of data to a Google Sheet
Version:0.1.2
Key:google_sheets-add-multiple-rows

Action Code

import googleSheets from "../../google_sheets.app.mjs";

export default {
  key: "google_sheets-add-multiple-rows",
  name: "Add Multiple Rows",
  description: "Add multiple rows of data to a Google Sheet",
  version: "0.1.2",
  type: "action",
  props: {
    googleSheets,
    drive: {
      propDefinition: [
        googleSheets,
        "watchedDrive",
      ],
    },
    sheetId: {
      propDefinition: [
        googleSheets,
        "sheetID",
        (c) => ({
          driveId: googleSheets.methods.getDriveId(c.drive),
        }),
      ],
    },
    sheetName: {
      propDefinition: [
        googleSheets,
        "sheetName",
        (c) => ({
          sheetId: c.sheetId,
        }),
      ],
    },
    rows: {
      propDefinition: [
        googleSheets,
        "rows",
      ],
    },
  },
  async run() {
    let rows = this.rows;

    let inputValidated = true;

    if (!Array.isArray(rows)) {
      rows = JSON.parse(this.rows);
    }

    if (!rows || !rows.length || !Array.isArray(rows)) {
      inputValidated = false;
    } else {
      rows.forEach((row) => { if (!Array.isArray(row)) { inputValidated = false; } });
    }

    // Throw an error if input validation failed
    if (!inputValidated) {
      console.error("Data Submitted:");
      console.error(rows);
      throw new Error("Rows data is not an array of arrays. Please enter an array of arrays in the `Rows` parameter above. If you're trying to send a single rows to Google Sheets, search for the action to add a single row to Sheets or try modifying the code for this step.");
    }

    return await this.googleSheets.addRowsToSheet({
      spreadsheetId: this.sheetId,
      range: this.sheetName,
      rows,
    });
  },
};

Action Configuration

This component may be configured based on the props defined in the component code. Pipedream automatically prompts for input values in the UI.

LabelPropTypeDescription
Google SheetsgoogleSheetsappThis component uses the Google Sheets app.
DrivedrivestringSelect a value from the drop down menu.
SpreadsheetsheetIdstringSelect a value from the drop down menu.
Sheet NamesheetNamestringSelect a value from the drop down menu.
Row Valuesrowsstring

Provide an array of arrays. Each nested array should represent a row, with each element of the nested array representing a cell/column value (e.g., passing [["Foo",1,2],["Bar",3,4]] will insert two rows of data with three columns each). The most common pattern is to reference an array of arrays exported by a previous step (e.g., {{steps.foo.$return_value}}). You may also enter or construct a string that will JSON.parse() to an array of arrays.

Action Authentication

Google Sheets uses OAuth authentication. When you connect your Google Sheets account, Pipedream will open a popup window where you can sign into Google Sheets and grant Pipedream permission to connect to your account. Pipedream securely stores and automatically refreshes the OAuth tokens so you can easily authenticate any Google Sheets API.

Pipedream requests the following authorization scopes when you connect your account:

emailprofilehttps://www.googleapis.com/auth/drive

About Google Sheets

With Google Sheets, you can create, edit, and collaborate wherever you are

More Ways to Connect Google Sheets + Procore

About Pipedream

Stop writing boilerplate code, struggling with authentication and managing infrastructure. Start connecting APIs with code-level control when you need it — and no code when you don't.

Into to Pipedream
Watch us build a workflow
Watch us build a workflow
4 min
Watch now ➜
"The past few weeks, I truly feel like the clichéd 10x engineer."
@heyellieday
Powerful features that scale
Manage concurrency and execution rate
Manage concurrency and execution rate

Queue up to 10,000 events per workfow and manage the concurrency and rate at which workflows are triggered.

Process large payloads up to 5 terabytes
Process large payloads up to 5 terabytes

Large file support enables you to trigger workflows with any data (e.g., large JSON files, images and videos) up to 5 terabytes.

Return custom responses to HTTP requests
Return custom responses to HTTP requests

Return any JSON-serializable response from an HTTP triggered workflow using $respond().

Use most npm packages
Use most npm packages

To use any npm package, just require() it -- there's no npm install or package.json required.

Maintain state between executions
Maintain state between executions

Use $checkpoint to save state in one workflow invocation and read it the next time your workflow runs.

Pass data between steps
Pass data between steps

Return data from any step to inspect it in a human-friendly way and reference the data in future steps via the steps object.