← Procore + Airtable integrations

Create Multiple Records with Airtable API on Prime Contract Change Order Event (Instant) from Procore API

Pipedream makes it easy to connect APIs for Airtable, Procore and 800+ other apps remarkably fast.

Trigger workflow on
Prime Contract Change Order Event (Instant) from the Procore API
Next, do this
Create Multiple Records with the Airtable API
No credit card required
Into to Pipedream
Watch us build a workflow
Watch us build a workflow
7 min
Watch now ➜
Trusted by 250,000+ developers from startups to Fortune 500 companies:
Trusted by 250,000+ developers from startups to Fortune 500 companies

Developers Pipedream

Getting Started

This integration creates a workflow with a Procore trigger and Airtable action. When you configure and deploy the workflow, it will run on Pipedream's servers 24x7 for free.

  1. Select this integration
  2. Configure the Prime Contract Change Order Event (Instant) trigger
    1. Connect your Procore account
    2. Select a Company
    3. Optional- Select a Project
  3. Configure the Create Multiple Records action
    1. Connect your Airtable account
    2. Select a Base
    3. Select a Table
    4. Configure Records
    5. Configure Typecast
  4. Deploy the workflow
  5. Send a test event to validate your setup
  6. Turn on the trigger

Details

This integration uses pre-built, open source components from Pipedream's GitHub repo. These components are developed by Pipedream and the community, and verified and maintained by Pipedream.

To contribute an update to an existing component or create a new component, create a PR on GitHub. If you're new to Pipedream component development, you can start with quickstarts for trigger span and action development, and then review the component API reference.

Trigger

Description:Emits an event each time a Prime Contract Change Order is created, updated, or deleted in a project.
Version:0.0.1
Key:procore-prime-contract-change-order

Trigger Code

const common = require("../common.js");

module.exports = {
  ...common,
  name: "Prime Contract Change Order Event (Instant)",
  key: "procore-prime-contract-change-order",
  description:
    "Emits an event each time a Prime Contract Change Order is created, updated, or deleted in a project.",
  version: "0.0.1",
  methods: {
    ...common.methods,
    getResourceName() {
      return "Change Order Packages";
    },
    async getDataToEmit(body) {
      const { resource_id: resourceId } = body;
      const resource = await this.procore.getChangeOrderPackage(
        this.company,
        this.project,
        resourceId
      );
      return { ...body, resource };
    },
    getMeta(body) {
      const {
        id,
        event_type: eventType,
        resource_id: resourceId,
        timestamp,
      } = body;
      const ts = new Date(timestamp).getTime();
      return {
        id,
        summary: `${eventType} Change Order ID:${resourceId}`,
        ts,
      };
    },
  },
};

Trigger Configuration

This component may be configured based on the props defined in the component code. Pipedream automatically prompts for input values in the UI and CLI.
LabelPropTypeDescription
ProcoreprocoreappThis component uses the Procore app.
N/Adb$.service.dbThis component uses $.service.db to maintain state between component invocations.
N/Ahttp$.interface.httpThis component uses $.interface.http to generate a unique URL when the component is first instantiated. Each request to the URL will trigger the run() method of the component.
CompanycompanyintegerSelect a value from the drop down menu.
ProjectprojectintegerSelect a value from the drop down menu.

Trigger Authentication

Procore uses OAuth authentication. When you connect your Procore account, Pipedream will open a popup window where you can sign into Procore and grant Pipedream permission to connect to your account. Pipedream securely stores and automatically refreshes the OAuth tokens so you can easily authenticate any Procore API.

Pipedream requests the following authorization scopes when you connect your account:

About Procore

The all-in-one construction management software built to help you finish quality projects — safely, on time, and within budget.

Action

Description:Create one or more records in a table by passing an array of objects containing field names and values as key/value pairs.
Version:0.2.0
Key:airtable-create-multiple-records

Action Code

import chunk from "lodash.chunk";
import airtable from "../../airtable.app.mjs";
import common from "../common.mjs";

const BATCH_SIZE = 10; // The Airtable API allows us to update up to 10 rows per request.

export default {
  key: "airtable-create-multiple-records",
  name: "Create Multiple Records",
  description: "Create one or more records in a table by passing an array of objects containing field names and values as key/value pairs.",
  version: "0.2.0",
  type: "action",
  props: {
    ...common.props,
    records: {
      propDefinition: [
        airtable,
        "records",
      ],
    },
    typecast: {
      propDefinition: [
        airtable,
        "typecast",
      ],
    },
  },
  async run({ $ }) {
    const baseId = this.baseId?.value ?? this.baseId;
    const tableId = this.tableId?.value ?? this.tableId;

    const table = this.airtable.base(baseId)(tableId);

    let data = this.records;
    if (!Array.isArray(data)) {
      data = JSON.parse(data);
    }
    data = data.map((fields) => ({
      fields,
    }));
    if (!data.length) {
      throw new Error("No Airtable record data passed to step. Please pass at least one record");
    }

    const params = {
      typecast: this.typecast,
    };

    const responses = [];
    for (const c of chunk(data, BATCH_SIZE)) {
      try {
        responses.push(...(await table.create(c, params)));
      } catch (err) {
        this.airtable.throwFormattedError(err);
      }
    }

    const l = responses.length;
    $.export("$summary", `Added ${l} record${l === 1
      ? ""
      : "s"} to ${this.baseId?.label || baseId}: [${this.tableId?.label || tableId}](https://airtable.com/${baseId}/${tableId})`);

    return responses;
  },
};

Action Configuration

This component may be configured based on the props defined in the component code. Pipedream automatically prompts for input values in the UI.

LabelPropTypeDescription
AirtableairtableappThis component uses the Airtable app.
BasebaseIdstringSelect a value from the drop down menu.
TabletableIdstringSelect a value from the drop down menu.
Recordsrecordsstring

Provide an array of objects. Each object should represent a new record with the column name as the key and the data to insert as the corresponding value (e.g., passing [{"foo":"bar","id":123},{"foo":"baz","id":456}] will create two records and with values added to the fields foo and id). The most common pattern is to reference an array of objects exported by a previous step (e.g., {{steps.foo.$return_value}}). You may also enter or construct a string that will JSON.parse() to an array of objects.

Typecasttypecastboolean

The Airtable API will perform best-effort automatic data conversion from string values if the typecast parameter is True. Automatic conversion is disabled by default to ensure data integrity, but it may be helpful for integrating with 3rd party data sources.

Action Authentication

Airtable uses API keys for authentication. When you connect your Airtable account, Pipedream securely stores the keys so you can easily authenticate to Airtable APIs in both code and no-code steps.

Visit your account settings, copy your API key, and enter it below. If you only need to read data from Airtable, and not modify it, you can generate a read-only API key.


get airtable api key

About Airtable

Looks like a spreadsheet, acts like a database.

More Ways to Connect Airtable + Procore